![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||
| Home ARTWORK BOATBUILDING FURNITURE PROJECTS LINKS CONTACT | |||||||||||||||||||||||||||||||||||||||||||||||||||||
Projects on the go > RESTORATION OF A FISH BOAT
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||
| Restoration of a Fish boat on the property. This boat is a 1949 double ender west coast fishing boat 32 ft long 10 ft beam cedar on oak being restored and converted to a cruising boat by Paul McManus. |
![]() |
![]() |
| Removing the concrete from the aft end bilge. |
![]() |
| Aft end starboard planking that is in bad shape, planning out the repairs. |
![]() |
| Removing old planking. |
![]() |
| Spilling plank shape for making new replacement in the future. |
![]() |
| A bunch of planks taken off and exposing all the frames that are going to be replaced. |
![]() |
| I am waiting in the boat for Paul, the boat owner, to bring me a steamed frame that will be installed. |
![]() |
| All new frames in the back starboard side. |
![]() |
Fitting a new plank. |
![]() |
| Almost finished the aft star planking, improvised clamping system to bring in the shutter plank. |
![]() |
| Starting on the port side aft, most planks are coming out but a few that are left in so as to keep the shape while new frames go in. |
![]() |
| Cooking a few potatoes in the steam box for lunch. |
![]() |
| Having to move fast with a freshly steamed white oak frame, and getting some help from Cliff Rob. |
![]() |
| All new frames installed on the starboard side, they are painted with a black Ace of spades. |
![]() |
| Starting to install new planking. |
![]() |
| Laying out spilling pattern on cedar board for new plank. |
![]() |
| Bunch of new planking installed on the port side. |
| Any questions contact Tony at tonygrove@live.com |